资源描述

《安德里茨设备操作安装维修手册.pptx》由会员分享,可在线阅读,更多相关《安德里茨设备操作安装维修手册.pptx(43页珍藏版)》请在课桌文档上搜索。

1、安德里茨设备操作,安装,维修手册,Safety instructions-Lifting,Mounting of Equipment,During Operation,the supplier of the screen is only responsible for the assembly of the screen,prior to delivery,during the mounting,the fastening of the washer installed at the end of,the shaft of the electric motor must be taken in

2、to account!,Check the maximum feed pressure of the screen from the dimensional,drawing appended to the instructions,Do not use the screen at a temperature higher than notified while the,order was being made,When the operating temperature exceeds 65C(prEN563),even short-term,surface contact may cause

3、 skin burn,All original guards of the screen must be appropriately fastened while,the screen is running-do not remove them during operation!,All maintenance of the screen and its drive motor is forbidden during operation,Safety instructions,de-aeration of the screen,Check the maximum feed pressure o

4、f the screen from the dimensional,drawing appended to the instructions,Do not use the screen at a temperature higher than notified while the,order was being made,When the operating temperature exceeds 65C(prEN563),even short-term,surface contact may cause skin burn,All original guards of the screen

5、must be appropriately fastened while,the screen is running-do not remove them during operation!,All maintenance of the screen and its drive motor is forbidden during operation,except:,lubrication of bearings,adjusting sealing water flow and pressure,During Operation,Safety instructions,Use appropria

6、te hoisting equipment when lifting the screen,Before maintenance,stop the drive motor and disconnect it from the,electrical supply,Before opening the cover of the screen:,make sure that the screen is de pressurized,make sure that no liquid or stock can flow into the screen,The screen can be started

7、after maintenance only after:,the cover of the screen has been closed,all original guards have been installed properly,Measure the thickness of the screen material regularly,The sealing water valve must be opened before starting,the drive motor of the screen!,During Operation,Power transmission in A

8、ndritz screens:,V-belts,Gearbox-only in large special units,NOTE!,Do not tension the belts over,the recommended area!,Tension Principle,Belt deflection,Bending force F,-Check the tensioning after 48 hours use,-Do not tension the belt over the recommended range,Equipment,F10,F20,F30,F40,F50,Deflectio

9、n(mm),15,15,20,20,25,Belt profile,SPB,SPC,Smaller pulley,160-224,236-315,224-355,375-560,mm,F(N),35-50,50-65,60-90,90-120,Tension V-belts,F60,32,General instructions for installation,Piping,Pipes should be supported in such a way that the weight of the pipes is not,taken by the screen,In locating th

10、e supports,take care to ensure that the pipes do not cause,stress to the screen,The supports must allow for thermal expansion of the pipes,If not,connections and screen body will be damaged!,Feed,accept,reject,reject dilution,rotor dilution,sealwater,deaeration,junk trap,emptying/flushing,Piping and

11、 Valve installation,Inspection before operation,Check belt tensioning,the direction of the motor rotation,foundation,foundation bolts and“V-belt pulley taperlocks”,Check that the interior is clean and that no foreign objects have,entered the screen,Inspect the pipe supports,Remove the screen cylinde

12、r before starting the screen for the first time(not always necessary,normally according to Andritz start-up supervisor instructions),Operation instructions Before starting the screen,Instrumentation and alarms,Always carry out a test run with water before productive operation-then the,flow control i

13、nstrumentation can be adjusted and the pressure instruments,be checked.,To prevent the screen from plugging one of the most important of the instruments is the pressure difference control alarm,The seal water measuring rotameter is equipped with a flow guard which can,be connected to the alarm cente

14、r,Feed stock consistency regulation takes place right after the supply tank by,means of the consistency or dilution flow controllers,Operation instructions Before starting the screen,Operating instructions-Starting,Start the screen in the following sequence:,.Ensure the seal water flow(2-5 l/min),.F

15、ill the screen with water,.Close the air exhaust valve at the screen cover,.Start the screen motor,.Open the reject valve(20%),keep accept valve closed,open reject dilution(30%),1,2,3,4,5,.Adjust the feed consistency to the level shown in the flow sheet,.Adjust the accept valve to the required flow

16、with the feed valve fully open,.Adjust the amount of flow to be discharged as reject with the reject valve,.Deaerate the screen through the air exhaust valve on the screen cover and close,the valve when there is a continuous flow of liquid from the connection,8,9,10,11,.Open the feed valve fully,6,7

17、,.Start the feed pump of the screen,Operation control and flow adjustment,Most important in operational control are:,When the screen has been started,it requires very little attention under,normal operation conditions,pressure difference measurement,reject flow regulation,reject dilution regulation,

18、electric motor load,The pressure and flow of seal water should be checked once in each shift!,Operating instructions-Starting,Stop and flush the screen in the following sequence:,.Stop the feed pump,.Close the accept valve fully while the screen is still operating,.Close the feed valve fully,.Open t

19、he dilution valve in order to flush the reject and the fibers to reject,treatment,.Close the reject valve and open the air exhaust valve on the screen cover,.Continue flushing until the liquid flowing from the air exhaust pipe no,longer contains fibers,.Unless it is necessary to open the cover and c

20、arry out a maintenance,inspection,the screen can be left filled with water until the next start-up!,Close the dilution,fresh water,and air exhaust valves.Stop the screen motor.,Close the seal water valve.,.If the downtime is longer or intended for maintenance inspections,leave,the air exhaust valve

21、open and close only the dilution and fresh water valves.,Stop the screen motor.Drain the screen by opening the drain valve.,Close the seal water valve.,1,2,3,4,5,6,7,8,.Ensure that the motor is disconnected from the electrical network!,9,Operating instructions-Stopping,Foreign objects in a ModuScree

22、n,ModuScreen does not function,Foundation is not steady enough,Shaft is bent,Rotor is damaged,Rotor not in balance,Screen cylinder is damaged,Sliding surfaces of seal are damaged,Seals are wrongly installed,Seals are of wrong quality,Seal water filter is blocked-up,Too much grease in bearings,Defect

23、ive lubrication,Bearings are damaged,Dirt or water in bearings,Unusually high power consumption,ModuScreen is vibrating,High noise level,Sealing housing is leaking,Seal water amount is low,Bearings are too warm,Short lifetime of bearings,Uneven accept flow,Uneven reject flow,FAILURE,CAUSE,OF,FAILURE

24、,Seekeing the mechanical failure,MAL-,FUNCTION,CAUSE OF,MALFUNCTION,Feed pump is too small,ModuScreen does not function,Feed pump pressure is too low,High feed consistency,Low feed consistency,Feed consistency varies suddenly,High feed amount,Low feed amount,High impurity content in feed,Lack of dea

25、eration in ModuScreen,ModuScreen rotates in the wrong direction,Too high rotation speed,Too low rotation speed,Reject does not get out of the ModuScreen,Sealing water is dirty,Small accept flow,Uneven accept flow,Uneven reject flow,High pressure difference,Low pressure difference,Unusually high powe

26、r consumption,Sealing housing is leaking,ModuScreen is vibrating,Accept flow stops,Seekeing the malfunction,Recommended lubricants,F50-60*),Mobilith SHC 460,Esso Ronex Extra Dutu 1,Shell Albida PPS,SKF LGEM 2,Neste High temp.grease 1,*)Heat resisting lubricant,grades only,LUBRICANTS,F10-F40*),Mobilu

27、x EP 2,Esso Beacon EP 2,Shell Alvania EP 2,Tebo Multi-Purpose Extra,SKF LGMT 3,*)the operating temp.range for,the lubricants is-30.+110 C.,Should the temp.exceed+110 C,lubricants are chosen as for F50-F60.,LOWER BEARING HOUSING,Screen,F10,F20,F30,F40,F50-F60,Bearing,type,NU 2313,NU 2316,NU 2324,2322

28、8 CC/W33,Manual,lubrication:,Grease/,lubrication,interval,35 g/2 months,50 g/2 months,115 g/2months,-*),Centralized,lubrication:,Grease/10 h,1 g*),2 g*),4 g*),6 g,NU 2324,115 g/2months,4 g*),UPPER BEARING HOUSING,Screen,F10,F20,F30,F40,F50-F60,Bearing,type,7313 BG,7316 BG,7324 BG,7330 BCBM/,7230 BCB

29、M,Manual,lubrication:,Grease/,lubrication,interval,50 g/2 months,70 g/2 months,145 g/2months,-*),Centralized,lubrication:,Grease/10 h,1 g*),2 g*),4 g*),6 g,7324 BG,145 g/2months,4 g*),*)F50 and F60 can be suppliedWith a lubrication center as anoption,*)the standard delivery doesnot include a lubrica

30、tion center,The main scope of delivery is,-screen housing and common,mounting frame(base plate),-rotor,-mechanical seal,-V-belt pulleys/V-belts,-shaft package,-seal water and lubrication,system,-screen cylinder,(electric motor),ModuScreen F10-F60,Screen cylinder and rotor lifting tool,Temperature se

31、nsors PT100,Temperature isolation,Vibration sensors SKF,Vibration sensors SPM(no DCS-connection),Accessories,Local pressure meters,Pressure transmitters(Electrical PMC transmitters),General assembly ModuScreen F10-F60,ModuScreen F10-F60,1,2,3,4,5,6,.Stop ModuScreen,flush and drain the screen,.Discon

32、nect the motor from the electrical network according to regulations,.Remove the air exhaust connection of the cover,open cover and move aside.,.Unscrew the mounting screws of the spacer ring and lift off the spacer ring,.Detach the screen cylinder from its fitting by screwing two spacer ring mountin

33、g screws into two opposite threaded holes M12 in the screen cylinder,.Screw two lifting eyes into two opposite M12 holes and lift off the screen cylinder.,Screen cylinder-dismounting,Wash detached parts,inspect potential wear,inspect the condition of the O-ringat the bottom end of the screen cylinde

34、r.,1,2,3,4,.Lower the screen cylinder into ModuScreen.Ensure that the cylinder is straight.The fitting at the bottom end and the anti-torsion screws at the top end guide the screen cylinder into place.,.Install the spacer ring into place.When the spacer ring is properly in its place,install the moun

35、ting screws of the spacer ring.,.Tighten the screws with a torque wrench to a tightness of 60 Nm crosswise following the numbering in following picture.If there are more screws than in the figure,follow the same principle as to the order in which the screws are tightened.,.Place the cover back into

36、place and tighten the mounting screws.,Screen cylinder-mounting,5,.Fasten the air exhaust connection hose of the cover.,Screen cylinder-tightening,Screen cylinder-fixing,Rotor and fixing element,NOTE!Do not mix the order of the parts!The central sleeve can be mounted correctly in one way only!,Insta

37、ll the rotor on to the shaft:,.THINLY OIL THE SHAFT END,ROTOR HUB AND OUTER AND CONICAL SURFACES OF THE FIXING SLEEVE.,.Attach two eyescrews into the holes on the rotor hub and lift the rotor onto the shaft.,.Mount the fixing sleeve part by part in accordance with the following picture,Mount the low

38、er conical ring of the fixing sleeve into place,Place the central sleeve on top of the lower conical ring so that the slits in the parts meet each other,Mount the upper conical ring(1)so that the slits in the parts meet each other.,With a torque spanner,tighten the screws of the fixing sleeve evenly

39、 cross-wise,little by little.Tighten the screws on both sides of the slit after one another.Tighten all screws until they have reached the given tightening torque.,1,2,3,The rotor must be removed for maintenance purposes or for the inspectionof the mechanical seal or the bearing unit.,.Remove the pr

40、essure plate and the gasket.,.Remove the central sleeve part by part.,1,2,Rotor,Tightening,Removing upper cone,Removing lower cone,NOTE!,When dismounting and mounting the central sleeve,Make absolutely sure NOT to mix the order of the parts.,The fixing element can be mounted correctly in one way onl

41、y,The upper and the lower conic ring must be in their correct,places(must no be mixed with each other)and the central,Sleeve must be the right way up.,Fixing element of the rotor,Torques:F10:41 NmF20:83 NmF30-F60:145 Nm,Standard Andritz mechanical shaft seal is double sided normally manufacturedby:S

42、afematic Burgmann,Mechanical seals sealing water,The requirement of clean sealing water is 0.03-0.08 l/s(2-5 l/min),the pressure of the water to the seal recommended to be 100 kPa higherthan the maximum inlet pressure of the screen;however,at least 300 kPa,NOTE:Burgmann mechanical seals require 100

43、kPa seal water pressureregardless the pulp feed pressure,provided that constant seal water flow0.03-0.08 l/s(2-5 l/min)is maintained,It is essential,to use the correct method of mounting and,to observe the rules of cleanliness,Avoid touching the sliding surfaces,Remove sharp edges from all shoulders

44、,DO NOT MOUNT THE PARTS,BY APPLYING DIRECT BLOWS,TO THE BEARING!,General on the installation seals,Double sided mechanical seal,Double sided mechanical seal-Safematic,Seal water piping,Reasons for dismounting the shaft:,service inspection,damage of bearings,change of bearings,The shaft can be dismou

45、nted with or without the bearing frame.,1,2,3,4,5,.Detach the bearing lubricating hoses.,.Detach the belt pulley and the splash guard.,.Detach the rotor.,.When lifting the shaft package out in complete,detach only the screws that,fasten the bearing frame to the screen.,.Support the bearing frame out

46、side the screen into horizontal position,remove the shaft seal loosen the bearing housing fastening screws,turn shaft the width of the fastening ears pull the shaft with bearings,out from the bearing frame.,We would recommend that the shaft be removed,WITH the bearing frame included.,Shaft package,Shaft package,Rotor,Complete bearing unit assembled and Shaft package assembled,Complete bearing unit assembled,Removing lower sleeve(CC),Removing lower bearing(NU),Removing upper bearing(BCBM),Removing upper bearing(BECBP),Installation of upper bearings,Installation of Lower bearings(NU),